Goethals Bridge





The Goethals Bridge /ˈɡÉ'θəlz/ connects Elizabeth, New Jersey to Staten Island (New York City), near the Howland Hook Marine Terminal, Staten Island, New York, United States over the Arthur Kill. Operated by the Port Authority of New York and New Jersey, the span was one of the first structures built by the authority. On the New Jersey side it is located south of Newark Liberty International Airport, 2 exits from the New Jersey Turnpike-Newark Bay Extension. The bridge has been grandfathered into Interstate 278, and named for Major General George Washington Goethals, who supervised construction of the Panama Canal and was the first consulting engineer of the Port Authority.

Design


Goethals Bridge

A steel truss cantilever design by John Alexander Low Waddell, who also designed the Outerbridge Crossing, the Goethals is 672 ft (205 m) long central span, 7,109 feet (2,168 m) long in total, 62 feet (19 m) wide, has a clearance of 135 feet (41.1 m) and has four lanes for traffic. The Port Authority had $3 million of state money and raised $14 million in bonds to build the Goethals Bridge and the Outerbridge Crossing; the Goethals bridge construction began on September 1, 1925 and cost $7.2 million. It and the Outerbridge Crossing opened on June 29, 1928. The Goethals Bridge replaced three ferries and is the immediate neighbor of the Arthur Kill Rail Bridge. Its unusual mid-span height was a requirement of the New Jersey ports.

Connecting onto the New Jersey Turnpike, it serves as one of the main routes for traffic between New Jersey and Brooklyn via the Staten Island Expressway and the Verrazanoâ€"Narrows Bridge. Until the Verrazano-Narrows Bridge was completed in 1964 the Goethals Bridge never turned a profit. The same happened to the Outerbridge Crossing. The total traffic in 2002 was 15.68 million vehicles.

The Goethals Bridge holds two 10-foot-wide (3.0 m) lanes in each direction, which do not meet the 12-foot (3.7 m) requirement of modern highway design standards. The bridge also has no shoulders for emergency access, or pedestrian walkways or bike paths. A completely new bridge that will address these deficiencies is now under construction. An initial study in 1997 concluded that the optimal solution would be a parallel span. However, a more recent study suggested that the existing span had only 10 years of life left, even with the recent deck rehabilitation, and that the optimal solution was an entirely new span. The choosing of the full replacement option was followed by the submittal of several design alternatives, alongside a "no build" option. It is likely that a new bridge would also include additional lanes of traffic, high-speed E-ZPass lanes, and a reconstruction and widening of Interstate 278 from exit 4 in New York (NY 440 South) to NJ 439 in New Jersey.

Bridge replacement


Goethals Bridge

The bridge is slated to be replaced. The new bridge will restore pedestrian and bicycle access. It will be a cable-stayed bridge and will have three 12-foot travel lanes in each direction, a 12 feet (3.7 m) outer and 5 feet (1.5 m) inner shoulder in each direction, and a 10 feet (3.0 m) walkway/bikeway on the New Jersey-bound side of the bridge. In addition, there will be an area between the eastbound and westbound roadways capable of accommodating a possible future mass transit link.

The initial alternatives put forth in summer 2006 included the option of twin three-lane replacement bridges north and south of the current alignment, which was completely eliminated; and twin three-lane replacement bridges (one south, and one along the current alignment), with the latter being built after the demolition of the current bridge, which was refined to be a single-span bridge instead of twin bridges. The reason for the dropping of twin-bridge alternatives in fall 2007 was a request by the FAA to decrease the height of the bridge's towers to prevent interference with flights into and out of Newark Liberty International Airport. Public open houses were held in Staten Island and Elizabeth, and the Draft Environmental Impact Statement (DEIS) was issued. Formal public hearings on the DEIS were held in July 2009.

All alternatives proposed that the bridge be single level, cable-stayed, double spans, separated by towers with a height of 135 feet (41 m) above the high-water mark of the Arthur Kill shipping channel. Each deck would have three 12 ft (3.7 m) lanes with a 12 ft (3.7 m) outer shoulder and 5 ft (1.5 m) inner shoulder and the northern deck would feature a 10 ft (3.0 m) pedestrian walkway. In addition, permanent access roads would be built under the bridge on land for maintenance, security, and construction purposes. Lastly, space would be left to accommodate potential mass-transit services.

For mass transit, studies indicated that a bus-only lane was not economically viable but that a high-occupancy vehicle lane open to buses as well as high-occupancy autos would be appropriate during rush hours if traffic supported it. Provision for rail transit was rejected; however, planners decided that whatever alternative was constructed, the design and structural integrity should ideally be able to be retrofitted for such at a later date. The suggestion for a freight rail connection was dismissed as uneconomic.

Also as part of the construction, improvements to approaches and nearby interchanges are to be made. These will include the New Jersey Turnpike exit 13 toll plaza (and perhaps the entire interchange), the Staten Island toll plaza, and the Interstate 278/NY 440 interchange. In addition, while separate from the bridge replacement project, the New Jersey Department of Transportation may construct full movements at the Interstate 278/U.S. Route 1/9 junction to coincide with the bridge's replacement.

Toll


Goethals Bridge

As of December 7, 2014, the cash tolls going from New Jersey to New York are $14 for cars and motorcycles; there is no toll for passenger vehicles going from New York to New Jersey. E-ZPass users are charged $9.75 for cars and $8.75 for motorcycles during off-peak hours (outside of 6â€"10 a.m. and 4â€"8 p.m. on the weekdays; and outside of 11 a.m.â€"9 p.m. on the weekends) and $11.75 for cars and $10.75 for motorcycles during peak hours (6â€"10 a.m. and 4â€"8 p.m. on the weekdays; and 11 a.m.â€"9 p.m. on the weekends).

In popular culture



The Goethals Bridge is featured in the opening credits of The Sopranos.

See also



  • List of bridges documented by the Historic American Engineering Record in New Jersey
  • List of bridges documented by the Historic American Engineering Record in New York

References



External links



  • Goethals Bridge
  • Goethals Bridge Replacement
  • Historic American Engineering Record (HAER) No. NY-305, "Goethals Bridge"
  • Goethals Bridge at Structurae


Share on Google Plus

About Unknown

This is a short description in the author block about the author. You edit it by entering text in the "Biographical Info" field in the user admin panel.
    Blogger Comment
    Facebook Comment

0 komentar :

Posting Komentar